ASPAR local solutions Solution at a glance -------------------- ASPAR selects vertical and inclined accessibility platforms for new and existing properties in Lviv. For a new design, the most useful time to engage is before openings, landing zones and adjacent structures are final. An existing building requires current photos and dimensions. This page is a practical starting point for architects, building designers, owners and contractors. It explains the inputs needed for ASPAR equipment without offering standalone third-party design services. 01 Which type of platform should be assessed ----------------------------------------- A vertical platform travels directly between levels and needs suitable landing zones. An inclined platform follows a flight of stairs, so stair geometry, travel path and clear passage must be checked. If a standard configuration cannot solve the task, ASPAR can assess a custom solution within its engineering scope. Start by comparing [accessibility lifting equipment](https://aspar.com.ua/en/pidiomnyky-dlia-invalidiv/), [vertical lift platforms](https://aspar.com.ua/en/vertykalni-pidiomni-platformy/) and [inclined stair platforms](https://aspar.com.ua/en/skhodovi-pokhyli-pidiomni-platformy/). Model-specific parameters must come from the relevant product page or an agreed proposal, not from another project. 02 Lviv scenario: integrating equipment during design --------------------------------------------------- The platform should be treated as part of the accessible route, not as an isolated object. Landing points, openings, entry direction, user approach, power and the division of preparatory work must be coordinated. For an existing building, drawings should be checked against current enclosures, doors and passages. Early coordination reduces the risk of incompatible construction decisions. ### Design checklist * plan and section of the installation area; * floor levels and the level difference; * opening, stair and landing dimensions; * entry and exit directions; * the proposed power connection point; * a contact responsible for coordinating adjacent work. For the full coordination workflow, use the [architects and building designers solution](https://aspar.com.ua/en/arkhitektory-ta-proektanty/). 03 What ASPAR checks ----------------- 1. Who will use the route and which level difference must be overcome. 2. The geometry of stairs, passages, openings and landing zones. 3. Entry and exit directions for the platform. 4. Indoor or outdoor placement and the actual operating conditions. 5. Available power and the agreed division of preparatory work. 6. The need for enclosures, doors and other elements of the project-specific configuration. Power supply preparation up to the installation point is usually the customer's responsibility. ASPAR can perform this work under a separate agreement. Site readiness and other preparatory work are defined for the specific property. 04 From enquiry to commissioning ----------------------------- 1. The customer sends photos, a plan or a drawing and briefly describes the task. 2. ASPAR checks whether the input is sufficient and clarifies constraints. 3. The company selects or develops a solution based on its own equipment. 4. The parties agree the configuration, scope and price. 5. ASPAR manufactures the equipment and completes the agreed delivery, installation, connection, adjustment, testing and commissioning. [Learn more about installation and commissioning](https://aspar.com.ua/en/montazh-i-demontazh/). Exact lead times, warranty terms and cost are defined in the agreed documents for each order. 05 ASPAR project in Lviv --------------------- ### Vertical lift serving a residential-complex shelter For a new residential development in Lviv, ASPAR manufactured and installed a vertical platform lift providing an accessible route to the shelter. The data for this project are a 2600 mm travel height, a 1400 × 1100 mm platform, outdoor placement and stainless-steel construction. [View the project and real photographs](https://aspar.com.ua/en/lviv-vertykalnyi-pidiomnyk-ukryttia-zhk/). [![ASPAR vertical platform lift serving a residential-complex shelter in Lviv](https://aspar.com.ua/content/uploads/images/aspar-horishni-vertical-lift-05.jpg)](https://aspar.com.ua/en/lviv-vertykalnyi-pidiomnyk-ukryttia-zhk/) ASPAR installation providing access to a residential-complex shelter in Lviv. These parameters belong to this property and are not a standard configuration for another building. 06 What to send for an initial assessment -------------------------------------- * the property address or district, without publishing private data on the website; * photos of the entire route and both landing zones; * the level difference or floor elevations; * the width and layout of the stairs if an inclined platform is being considered; * available dimensions and preferred entry directions; * a plan, section or drawing if available; * information about the installation location and available power. If some information is missing, ASPAR will identify what is required before a technical solution can be prepared. 07 Useful guidance before contacting ASPAR --------------------------------------- * [How to choose a lift for people with disabilities](https://aspar.com.ua/en/yak-vybraty-pidiomnyk-dlia-osib-z-invalidnistiu/) * [What architects and building designers should consider](https://aspar.com.ua/en/chomu-dostupnist-treba-planuvaty-shche-na-etapi-kreslen/) * [ASPAR lift platform certification and its scope](https://aspar.com.ua/en/sertyfikatsiia-pidiomnykiv-aspar-normatyvni-vymohy-ukraina/) Certification supports a defined equipment category. It does not automatically establish that the entire building complies with all applicable requirements. 08 Frequently asked questions -------------------------- ### What should a designer provide for the first review? A plan or sketch of the area, levels, available dimensions, expected route and power information. ASPAR will identify anything missing. ### Does ASPAR sell drawings as a separate service? No. Design work and drawings relate to ASPAR's own equipment and integrated solutions. ### Should we wait until building work is complete? No. For a new property, inputs should be checked while openings, landing zones and adjacent elements can still be coordinated. 09 Discuss equipment for a property in Lviv ---------------------------------------- [Send the project data for assessment](https://aspar.com.ua/en/kontaktna-informatsiya/) or call +38 066 307 58 87.