SOLUTIONS FOR DEVELOPERS AND GENERAL CONTRACTORS

Lifting solutions for developers and general contractors

ASPAR helps define the lifting-equipment category, agree the input data and integrate a solution into the actual facility. Supply, installation and coordination scope are agreed separately for every order.

ASPAR vertical lift to a residential-complex shelter in Lviv

Tasks at the construction stage

A solution may support an accessible route, internal logistics or custom integration.

01

Entrances and shelters

Overcoming level changes and integrating equipment into the user route.

02

Goods between levels

Selecting equipment by load, platform, height and loading method.

03

Project coordination

Agreeing geometry, openings, power input, site readiness and work boundaries.

The task ASPAR solves

ASPAR reviews plans or measurements, the task, load, levels, route, installation access and project stage. A technical direction is formed after the input data are checked.

Recommended solution types

01

Vertical lifting platforms

For an accessible route where a vertical integration zone is available.

Learn more
02

Cargo lifts

For moving goods between levels under a separate technical brief.

Learn more
03

Custom solutions

When a standard configuration does not fit the site's geometry or scenario.

Learn more

What determines the selection

Plans or measurements, site photos and a task description are sufficient for initial review.

  • purpose and use scenario
  • height, levels and route
  • load and platform
  • opening, shaft or stairs
  • indoor or outdoor conditions
  • construction stage and responsible party

Developer project

ASPAR ramp at a developer facility in Sofiivska Borshchahivka

23 folding aluminium ramps in Sofiivska Borshchahivka

ASPAR manufactured and installed a batch of ramps for a developer's facility. For another project, quantity, geometry and installation method are determined by the conditions of the specific site.

View the project

Integration and site preparation

Landing zones, fixings, guarding, doors or gates, power input and site readiness are agreed before manufacture. Public materials do not expose working drawings or reproduction-enabling calculations.

Useful resources and services

Installation and commissioning

Open

Building accessibility: guidance for developers

Open

ASPAR equipment certification and conformity

Open

Frequently asked questions

When should ASPAR be involved?

As soon as the task, route and basic geometry are known; this helps avoid incompatible late-stage decisions.

Which materials are needed to start?

Plans or measurements, photos, height, levels, load and a responsible contact.

Who performs adjacent work?

Construction, electrical and installation responsibilities are defined for the specific order.

Need a solution for a new or existing facility?

Send plans or measurements, site photos and a task description. ASPAR will check the input data and propose a technical direction for coordination.