In 2021, Pidiomni Tekhnolohii («Підйомні технології»), then led by Vitalii Tumaikin, supplied a 72-metre passenger and materials hoist for Limak. It was installed at the Muzeina station construction site in Dnipro. This is Tumaikin’s experience before founding ASPAR, not an ASPAR supply contract.

Moving people and materials underground
Limak needed a hoist to move workers and materials between the surface and the underground metro construction site.
Supplier and Vitalii Tumaikin’s role
The supplier was Pidiomni Tekhnolohii. Vitalii Tumaikin was its director at the time and discussed the project alongside a Limak representative.
PROJECT DETAILS


A 72-metre hoist at Muzeina
The hoist was installed on the Muzeina station construction site. Informator’s report of 8 December 2021 describes the project and quotes representatives of both companies.

Goods lifts in the catalogue
For other materials-handling tasks, explore the related category of mast goods lifts. Equipment for a new site is selected separately to suit its purpose and operating conditions.
Frequently asked questions about the project
Who supplied the hoist?
Pidiomni Tekhnolohii, then led by Vitalii Tumaikin. ASPAR was not the supplier.
Where was the hoist installed?
At the Muzeina metro station construction site in Dnipro.
What does 72 m refer to?
It is the hoist height reported in 2021, not a verified shaft depth or platform travel.